Finally the machines arrived and we are installing them on 5 July 2004.

The new assembly line in the big building (across the bridge)



The curved tube (suspended system) of the assembly line.



In the small building remains the pre assembly line (preparation). Here a picture of the steam Ironing department in the preparation.



A picture of the machines in the small building, preparation line.



The press where we waited so long for happened to be a complete different type as ordered. It is even not Hydraulic but Pneumatic.