SALEM KOMSAN |
|||||
Pictures of the construction of the company. PAGE
3
|
|||||
The red part of the building are: the offices and the cuttingroom of Salem Shirts
The colored part are the buildings of Salem Shirts. The dark bleu and red parts are the Salem buildings.
A view from out of the cutting room in the direction of the big stitching hall. Inside the big stitching hall. (see hole in back)
The first Egyptian stitching ladies arrived ! It is Christmis 25 dec 2003 today. |
|||||
Go to next pictures page 4 | |||||