Morning at WKR Jn.

 

Image1.jpg (54565 bytes) This is the YP 2805 shunting to isolate one coach and coupling to the three coaches that forms the 416 down fast passenger to Morbi.
Image2.jpg (54651 bytes) Those who notice the photographer's shadow (mine !) on the ground will also see the shadow of the 416 down rake. The loco moves back after leaving the cut off coach on another line.
Image3.jpg (64618 bytes) One more shot of the loco.
Image4.jpg (50003 bytes) YP 2805 shows off its linkage after coupling. Wankaner has only one platform line which was being cleared when the shunting pushed the rake to the middle line. Hence the train departed from a non platform line.
Image15.jpg (43321 bytes) The coupling of a loco is the one event that many non railfans always watch with great interest.

 

AG00083_.gif (509 bytes) Back to the index page

 AG00084_.gif (503 bytes) Next page