Boiler cleanup and shed staff at WKR

Image61.jpg (34082 bytes) YP 2805's boiler's blowdown valve being opened. The boiler is thus cleaned of sludge and sediments by venting under steam pressure.
Image62.jpg (35804 bytes) Driver Govind Ghadavi watches his loco being prepared for the 1815 hrs. departure.
Image50.jpg (37100 bytes) The shed and driving staff in and atop the YP's cab.
Image51.jpg (47950 bytes) Same friendly gang with their loco while the boiler is being blown down in the background.

 

AG00083_.gif (509 bytes) Back to the index page

 AG00084_.gif (503 bytes) Next page