414 Down, 1815 Hrs. depature to MVI

Image63.jpg (54490 bytes) This is Wankaner platform 1, the only MG platform in the complex. These are the levers to set the starter signals on line 1 and 2. This signal platform and locally controlled points form the simple signalling sytem for the MG lines.
Image64.jpg (48239 bytes) Driver Govind and his crew ready to start the train.
Image65.jpg (42053 bytes) The steam turbine generator for the headlight and the cab lights for the night operation gives a tired whine.
Image66.jpg (47388 bytes) A night view of the loco as it waits at Rafaleshwar. I was surprised to see that a naked lamp was additionally attached near the main driving wheel rather than under the cab, where the crew need to see the injector water feed. I have a picture of the loco with its tender headlight on, but the camera flash totally overwhelmed the weak headlight. Thus the pictures shows no details and is not here.

 

AG00083_.gif (509 bytes) Back to the index page

 AG00084_.gif (503 bytes) Next page