Construction Log

Zenith Zodiac 601HD

SN: 6-3951

Builder: Chris Boultinghouse

Date and Comments

Time

Cost

01 Feb 99:

No building.

0.0 hrs

$0.00

02 Feb 99:

Formed right S9 nose rib and both S8 nose ribs. All outboard nose ribs are now formed.

1.0 hrs

$0.00

03 Feb 99:

No building.

0.0 hrs

$0.00

04 Feb 99:

No building.

0.0 hrs

$0.00

05 Feb 99:

No building.

0.0 hrs

$0.00

06 Feb 99:

No building.

0.0 hrs

$0.00

07 Feb 99:

Formed both S6 rear ribs.

1.0 hrs

$0.00

08 Feb 99:

Purchased ball bearings to make flanging tool. Formed left and right S8 and S9 rear ribs. All OB ribs are now formed.

1.5 hrs

$16.02

09 Feb 99:

Cut lightening holes in all OB ribs. Using WD-40 on rib blanks made the circle cutter work much better. Very little tendency to "grab".

2.0 hrs

$0.00

10 Feb 99:

No building.

0.0 hrs

$0.00

11 Feb 99:

No building.

0.0 hrs

$0.00

12 Feb 99:

No building.

0.0 hrs

$0.00

13 Feb 99:

Made hole flanging tool and flanged holes in all OB ribs.

4.0 hrs

$0.00

14 Feb 99 through 26 Feb 99:

No building.

0.0 hrs

$0.00

27-28 Feb 99:

Attended Zenith Factory Workshop and built rudder. Price noted includes the Saturday night dinner.

11.0 hrs

$353.18