Construction Log
Zenith Zodiac 601HD
SN: 6-3951
Builder: Chris Boultinghouse
Date and Comments |
Time |
Cost |
01 Feb 99: No building. | 0.0 hrs | $0.00 |
02 Feb 99: Formed right S9 nose rib and both S8 nose ribs. All outboard nose ribs are now formed. | 1.0 hrs | $0.00 |
03 Feb 99: No building. | 0.0 hrs | $0.00 |
04 Feb 99: No building. | 0.0 hrs | $0.00 |
05 Feb 99: No building. | 0.0 hrs | $0.00 |
06 Feb 99: No building. | 0.0 hrs | $0.00 |
07 Feb 99: Formed both S6 rear ribs. | 1.0 hrs | $0.00 |
08 Feb 99: Purchased ball bearings to make flanging tool. Formed left and right S8 and S9 rear ribs. All OB ribs are now formed. | 1.5 hrs | $16.02 |
09 Feb 99: Cut lightening holes in all OB ribs. Using WD-40 on rib blanks made the circle cutter work much better. Very little tendency to "grab". | 2.0 hrs | $0.00 |
10 Feb 99: No building. | 0.0 hrs | $0.00 |
11 Feb 99: No building. | 0.0 hrs | $0.00 |
12 Feb 99: No building. | 0.0 hrs | $0.00 |
13 Feb 99: Made hole flanging tool and flanged holes in all OB ribs. | 4.0 hrs | $0.00 |
14 Feb 99 through 26 Feb 99: No building. | 0.0 hrs | $0.00 |
27-28 Feb 99: Attended Zenith Factory Workshop and built rudder. Price noted includes the Saturday night dinner. | 11.0 hrs | $353.18 |