This is where I´m now, all sheet metal installed (except for hood) installing brakes (all new).
After this the fuel tank and lines will be installed.
Discovered that 1 rear axle bearing had damaged the shaft badly, so I have to look for another one.
Started with installing the engine and transmission, both have been dismatled completely and rebuilt.
Here are your options: