Pic #1
In this picture I'm almost done with the top section. There was a total of four sections, well four different hieghts that I had to work from.
Pic #2
In this picture I'm working on the second section of the building, and I had already gotten some of the lower sections done. I had to work around other stuff that was being done there, this side of the building was where the shop was, so they were always in and out when they were doing maintenance on the rigs.
Pic #3
You can see in this picture that the front of the building had a cream colored block that that had a little shine to it.
Pic #4
I'm getting close to finishing this side of the building in this picture.
More Pictures To Come!