Sorry it took so long to get these other pictures onto the page, but I had a hard time uploading them. I guess Tripods builder couldn't upload the pictures because they were to big in size. So I had make them smaller, so they might not be quite as good in quality as some of the other pictures on my page.
Pic #1
In this picture, I'm almost done. Well done with one side of the building.
Pic #2
I am completely done with the stucco on this side of the building in this picture, the building is supposed to be painted a light gray, but the weather didn't allow it to be done.
Pic #3
This is the back half, of this side of the building, only one side of the building was done in 1999, the other side will be done this summer. A lot of work has to be done before the other side is ready for the stucco, there are quite a few loose cinder blocks and blocks that are missing.
Pic #4
This is a picture from up on the JLG lift.
More Pictures To Come!
Back to Bill's Drywall main page