Well we had another install party. This one lasted two days and
as you can see from the pictures, the weather could have been a little
nicer. Both days we got some installs done and on day two, we made a trip
to the local construction site to get muddy.
Here is our make shift tent city. We managed to install a lift, steering
box brace, front tow hooks, rear receiver, ect.
The steering box brace for Eric's XJ
The lift for Edie's XJ
We even got Michelle (MAV) under a Jeep and working.
The rain was good for something after all.
Our only stuck. A quick pull by an XJ, and the TJ
was Free:^).
Well we all had a blast and got a little dirty. Saturday we ordered pizza and Sunday we had a BBQ. Sorry to those of you who missed it. Hopefully you can make it next time.