These three phots show Canyon Diablo Bridge, built for me by Loren Neufeld, MMR. The container in bottom of canyon is there because of a prototype photo I have showing one there also. The prototype is double track and almost twice as long as I had space for. Since I was building it half the length, figured only one track wide would look more proportional.