Up

 

 

 

Fill Transfer


             

  Proper transfer means consistent fill patterns

An extremely important step in setting up the process 

for consistency.

 

        Set it up right the first time

    • Drop pack and hold times to 0.0 seconds
    • Adjust transfer position to point where part is 95-98% full.
    • Assure that proper injection pressure is set

Completely remove pack and/or hold time to 0.0 seconds.  

Upon completion of purging barrel, engage injection unit against mold and run machine in SEMI-AUTOMATIC until the proper transfer position is set.  

Run approximately 5 shots that are short and then set transfer position to where the PARTS are 95-98% full. Never completely fill out a shot due to variances in material densities and also venting.

Always fill the cavities as fast as the mold will which reduces stress in the plastic and also aligns the molecules. 

 Once the parts are filled to proper amount add time to packing. Adjust pack time and pressure to accommodate gate seal-off.


 

Information Request Form

Select the items that apply, and then let us know how to contact you. Please fill in form completely and add process parameters.

Send additional literature pertaining to subject
Send cost estimate for troubleshooting problem
Have a Technical Rep contact me

Name
Title
Company

Actual melt temperature

Transfer pos. setting

Material moisture content

Pack time

Pack press

Cushion low and high

Clearly state process problem or Quality issue

E-mail
Phone